Spanish Revival stucco exterior being repainted in Beverly Hills, CA.

Painting Contractor in Beverly Hills, CA for Estate Interiors and Stucco Exteriors

Santa Monica Expert Painting is Los Angeles County's trusted expert in residential painting, specializing in Spanish and Mediterranean stucco restoration, mid-century flat-facade repaints and estate interior finishes. We offer Venetian plaster application and cabinet spraying, colour-matched specialty coatings and complete exterior systems.

From cutting a failed sealant joint out of a 1928 parapet to staging an entire interior around a design team's approval calendar, our team handles every detail. Working from our Santa Monica base and serving Beverly Hills, Bel Air and Brentwood, we grade each elevation and scope prep separately from finish. Fully licensed, insured and bonded.

Request a FREE Quote!

Or call (424) 268-2200. Calls only, we do not receive text messages.

  • Industrial and protective coatings
  • Shutdown windows planned, not hoped for
  • Tract stucco and texture matching
  • Licensed, insured and bonded

01

Painting services we provide in Beverly Hills

Four scopes cover most of what we are asked for inside 90210, 90211 and 90212.

Interior painting

Walls, ceilings, trim, doors and stairwells, sequenced room by room so the house stays livable while the work runs. See the full interior painting scope.

Exterior and stucco coating

Crack repair, elastomeric recoats and acrylic systems. Most exteriors here are stucco, which puts stucco preparation and coating at the centre of nearly every bid.

Specialty and decorative finishes

Venetian plaster, Marmorino and Roman clay, troweled thin, burnished and sealed. That is our decorative and Venetian plaster work.

Cabinet refinishing and spraying

Kitchens, pantries and built-ins sprayed in lacquer or conversion varnish for a factory-flat film. See cabinet painting and refinishing.

02

What Beverly Hills homes do to paint

Beverly Hills packs 16,242 housing units into 5.71 square miles, and the paint problems split by district.

Trousdale Estates. 410 acres developed mainly through the 1950s and 60s, and the architecture shows it. Flat rooflines, long unbroken wall planes, deep eaves, metal window frames. Those planes are unforgiving: a lap mark reads across twenty feet of wall in raking afternoon light. Trousdale also climbs the slope below the Santa Monica Mountains, so crews work off graded pads and switchback driveways, and access drives the hours more than square footage does.

The Flats. South of Sunset and north of Santa Monica Boulevard the ground goes level and the stock goes older. Spanish and Mediterranean stucco from the 1920s and 1930s, deep-set window reveals, clay tile roofs, wrought iron at balconies and gates, arched openings no spray gun finishes on its own. Portland cement stucco of that age is hard and brittle, so it cracks wherever the base has moved.

Exposure. Sitting inland spares Beverly Hills the chloride load that eats coatings in Malibu. What it gets instead is sun, so UV-stable acrylic and correct film build matter more here than salt-resistant chemistry.

Tenure runs 42.0% owner-occupied against 58.0% renter. The landmark stock sets the standard clients hold their own walls to: City Hall in Italian Renaissance style from 1931, the 55-room Greystone Mansion, Pickfair from 1921.

Single-family home exterior being repainted in Beverly Hills, CA
In the Flats, 1920s and 1930s cement stucco is hard and brittle, and it cracks wherever the base has moved.

03

Materials, coatings and sheens

Sheen is a decision, not a default, and the system follows the substrate rather than the sales sheet.

Coating systems and where each one belongs on a Beverly Hills property
SystemWhere it goes
100% acrylic latex, exterior gradeStucco field surfaces. Best UV and colour retention in a breathable film
ElastomericHigh-build flexible coating for stucco with active cracking
Waterborne alkydTrim, doors and iron. Hard-curing, low odour, no yellowing
Lacquer or conversion varnishSprayed cabinetry and built-ins
Limewash and silicate mineral paintOlder lime stucco that must stay breathable

Flat and matte hide irregularity on old stucco but resist washing. Eggshell and satin take cleaning indoors. High-gloss trim magnifies every ridge underneath, so it buys sanding hours. Everything we apply meets South Coast AQMD Rule 1113 VOC limits.

04

Our process

Six stages, and the first two happen before a tin is opened.

  1. Walk and takeoff

    Elevation by elevation outside, room by room inside, with prep and finish written as separate lines rather than one number.

  2. Colour approval

    Large drawdowns on the wall itself, viewed morning and late afternoon, because Trousdale light moves a tint further than a fan deck suggests.

  3. Protection

    Floors, stone, glass, cabinetry, landscape and pool surrounds masked before anything else begins.

  4. Preparation

    Pressure washing, scraping, sanding, crack repair, wood rot replacement, caulking, skim coating, and lead-safe RRP containment where the house predates 1978.

  5. Priming

    Bonding primer over chalked film, stain-blocking primer over staining, masonry primer on bare repairs.

  6. Finish and punch

    Two coats at specified thickness, sprayed and back-rolled outside, brushed and rolled inside, then a walk-through and a correction list.

Failing paint being scraped from wood siding before repainting in Beverly Hills, CA
We photograph prep as it happens, so the preparation you paid for is documented before the finish buries it.

05

What shapes a Beverly Hills estimate

We scope prep separately from finish, because prep is where the variation lives.

Hillside access in Trousdale. Graded pads and switchback driveways mean staging and safe set-up take time before any coating starts. On the slope, access can move the hours more than the square footage does.

Linear feet of iron. Balcony railings, window guards, gates and perimeter metal are hand work, and on a Flats property with extensive wrought iron they can carry more labour than the walls.

Coats a deep tint needs. Saturated colours need more passes to cover uniformly, and on long unbroken Trousdale wall planes uniformity is the whole job.

Substrate condition. Active cracking, wood rot, failed sealant joints and chalked previous coatings are counted and photographed at survey rather than estimated from the kerb.

Specification. An elastomeric over active cracking, a breathable mineral system on old lime stucco and a standard acrylic on sound stucco are three different jobs.

Approval calendar. Where a design team signs off drawdowns, the schedule follows their calendar, and we plan for it rather than around it.

Call (424) 268-2200 for a free on-site estimate anywhere in 90210, 90211 or 90212.

06

Neighbourhoods, streets and commercial work

All three residential ZIPs, plus a commercial base that repaints on its own schedule.

Where we work

Trousdale Estates on the north slope, the Flats between Sunset and Santa Monica Boulevard, and the blocks either side of Beverly Drive, Canon Drive, Crescent Drive and South Beverly Drive. Homes fronting the two-mile Beverly Gardens Park get an extra look at street-facing walls. Full coverage sits on our service areas page.

Commercial painting in Beverly Hills

The commercial base here is genuinely mixed. Retail storefronts inside the Golden Triangle bounded by Santa Monica Boulevard, Wilshire Boulevard and Crescent Drive, hotel corridors, and the medical and dental suites along Wilshire all repaint on their own schedules, usually at night or across a weekend so the space trades the next morning. Phasing, certificates of insurance and closeout for that work run through our commercial painting division.

07

Beverly Hills painting questions

How long does a Beverly Hills exterior repaint take?

A two-storey stucco house runs one to two weeks. Prep is the variable, not painting. Heavy crack repair or wood replacement can add a week, and we would rather tell you that at survey than discover it in week two.

Can you match the original colour on a 1920s Spanish house?

Yes. We pull a sample from a protected spot, usually inside a window reveal or under a porch soffit, and match that rather than the sun-faded field surface.

Do Trousdale Estates homes need a different specification?

Often. Those flat facades have long uninterrupted planes and metal window frames, so we spray and back-roll for uniformity and prime the metal separately with a direct-to-metal product.

Is a city permit required for exterior painting?

Straight repainting normally does not require one, though colour and design review can apply to designated landmark properties. We confirm the requirement for your specific address before scheduling.

Can you work to a designer's finish schedule?

Routinely. We submit drawdowns for approval and paint to the approved sample, not to a paint code.

What separates elastomeric from standard exterior paint?

Elastomeric is a much thicker, flexible film that bridges hairline stucco cracks. It earns its place only where a cracking pattern is active. Sound stucco performs better under a standard acrylic system.

Are lead-safe practices used on the older Flats houses?

Yes. Lead painters are RRP certified, and anything predating 1978 gets containment and controlled preparation whenever we disturb existing coatings.

08

Related services and nearby areas

The scopes most often added to a Beverly Hills estimate.

Every painting service we offer.

Other service areas

Estate work up the hill in Bel Air, and across the 405 in Brentwood. We cover nine other Westside and Peninsula cities from the same Santa Monica base.

Get a free Beverly Hills painting estimate

We will walk the property, test adhesion and write a scope that separates prep from finish.

  • Free written estimate, prep scoped separately
  • Prep photographed as it happens
  • Licensed, insured and bonded

Request a FREE Quote!

Or call (424) 268-2200. Calls only, we do not receive text messages.